|
Constant Torque Spring - Damping Question
|
|
0
|
830
|
November 16, 2020
|
|
Non-metallic wheel bearings
|
|
3
|
1283
|
November 4, 2020
|
|
Drying Technology Options
|
|
11
|
1394
|
October 26, 2020
|
|
Sizing process piping for vacuum service
|
|
8
|
2551
|
September 27, 2020
|
|
Surface Finish (Texture) Symbols
|
|
0
|
10726
|
September 9, 2020
|
|
Cleaning ideas for 6" Dia. Combustion Air Ducts
|
|
7
|
1167
|
September 22, 2020
|
|
Great Primer on Heat Transfer
|
|
0
|
1050
|
September 14, 2020
|
|
Steam Tables
|
|
0
|
1018
|
September 13, 2020
|
|
Surface Texture Equivalents
|
|
0
|
1496
|
September 9, 2020
|
|
Examples of Identifying Surface Texture Requirements on Drawings
|
|
0
|
2100
|
September 9, 2020
|
|
Index of ISO Hole and Shaft tolerances/limits
|
|
0
|
1308
|
September 8, 2020
|
|
Good reference site on Gear Selection Options
|
|
0
|
1138
|
September 4, 2020
|
|
Reference Site for Popular ME Formulas
|
|
1
|
731
|
September 6, 2020
|
|
Is a Lock Washer an Effective Torque Retention Device?
|
|
6
|
6952
|
September 5, 2020
|
|
Excellent ME Reference Site
|
|
1
|
1103
|
September 4, 2020
|
|
Pressure regulator performance question
|
|
19
|
3057
|
September 3, 2020
|
|
Closed Loop Hydraulic System
|
|
2
|
1230
|
August 13, 2020
|
|
Positional Tolerances
|
|
3
|
896
|
August 6, 2020
|
|
ZEMAX Ideal Lens Simulation
|
|
1
|
3056
|
August 6, 2020
|
|
Calculating Locational Tolerances
|
|
0
|
825
|
August 5, 2020
|
|
Steam Condensate Question
|
|
1
|
942
|
July 31, 2020
|
|
S&T Exchanger - Machining Down Flange Faces
|
|
0
|
1354
|
July 28, 2020
|
|
Water Lubricated Vertical Turbine Pump
|
|
0
|
1569
|
July 27, 2020
|
|
Accurate Measurement of Effective Dynamic Load of Equipment Transmitted to the Floor
|
|
0
|
761
|
July 27, 2020
|
|
Pipe Shield to Prevent Burns from Uninsulated Pipe
|
|
0
|
988
|
July 27, 2020
|
|
Pipe Supports - Material Issue
|
|
0
|
825
|
July 27, 2020
|
|
Supply air gap between coil housing and plenum
|
|
2
|
1761
|
July 17, 2020
|
|
Pump vs. Gravity Head
|
|
0
|
1139
|
July 14, 2020
|
|
Closed Loop Chilled Water System
|
|
0
|
5453
|
July 9, 2020
|
|
BPVC check for plastic collapse - Elastic plastic analysis
|
|
0
|
846
|
July 8, 2020
|